Use the sections below to browse and download the published Application to An Coimisiún Pleanála. Click a section heading to expand the available files.
Volume A Non-Technical Summary
Volume B EIAR Main Report
- Chapter 1 Introduction
- Chapter 2 Background and Project need
- Chapter 3 Planning and Policy
- Chapter 4 Project Description
- Chapter 5 Assessment of Reasonable Alternatives
- Chapter 6 Traffic & Transportation Assessment
- Chapter 7 Population
- Chapter 8 Human Health
- Chapter 9A Biodiversity (Terrestrial)
- Chapter 9B Biodiversity (Aquatic)
- Chapter 10 Land, Soils and Hydrogeology
- Chapter 11 Water
- Chapter 12 Air Quality
- Chapter 13 Climate
- Chapter 14 Noise and Vibration
- Chapter 15 Material Assets Agriculture
- Chapter 16 Material Assets Non-Agriculture
- Chapter 17 Cultural Heritage
- Chapter 18 Landscape and Visual
- Chapter 19 Interactions and Cumulative Effects
- Chapter 20 Risks of Major Accidents and Disasters
- Chapter 21 Schedule of Environmental Commitments
Volume C Technical Appendices
Chapter 4 Project Description
- C4.01 Environmental Operating Plan
- C4.02 Construction Traffic Management Plan
- C4.03 Biodiversity Management Plan
- C4.04 Invasive Species Management Plan
Chapter 5 Assessment of Reasonable Alternatives
- C5.01 Assessment of Alternatives Report
- C5.02 Key Alternatives for Road Layouts
- C5.03 TEN-T EIAR Compound Assessment
- C5.04 S1 River Finn Crossing SOR
- C5.05 S2 River Swilly Crossing SOR
- C5.06 S3 N14-N15 to A5 Link SOR
- C5.07 S3 River Finn Crossing (N14/15 to A5 Link) SOR Addendum
- C5.08 Consultations Summary
Chapter 6 Traffic & Transportation Assessment
Chapter 7 Population
Chapter 8 Human Health
Chapter 9A Biodiversity (Terrestrial)
- C9A.01 Terrestrial Ecology Baseline Report
- C9A.02 Ecological Evaluation Criteria
- C9A.03 Consultations
- C9A.04 Bat House Description
- C9A.05 Deer Collision Risk Assessment
- C9A.06 Bat Derogation Licences
- C9A.07 Badger Artificial Sett Construction
Chapter 9B Biodiversity (Aquatic)
- C9B.01 Aquatic Ecology Survey Site Descriptions
- C9B.02 Aquatic Ecology Survey Site Images
- C9B.03 Aquatic Ecology Q-Value Data
- C9B.04 Aquatic Phase Construction Phase Impacts (Culverts)
- C9B.05 Aquatic Ecology Operational Phase Impacts (Culverts)
- C9B.06 Aquatic Ecology Loughs Agency Fisheries Data (2020-2024)
- C9B.07 Aquatic Ecology Road De-icing Water Quality Examination
Chapter 10 Land, Soils and Hydrogeology
- C10.01 Groundwater Level Monitoring Data
- C10.02 Permeability Testing Results
- C10.03 Water Quality Results
Chapter 11 Water
- C11.01 Section 1 Flood Risk Assessment
- C11.02 Section 2 Flood Risk Assessment
- C11.03 Section 3 Flood Risk Assessment
- C11.04 Water Framework Directive Compliance Report
Chapter 14 Noise and Vibration
- C14.01 Equipment Calibration Certificates
- C14.02 Photographs of Unattended NMLs
- C14.03 Baseline Noise Survey Data
- C14.04 Road Traffic Maps
- C14.05 Operational Results without Cross-border Link
Chapter 16 Material Assets Non-Agriculture
- C16.01 Landtake Assessment
- C16.02 List of Waste Codes
- C16.03 Construction and Demolition Resource and Waste Management Plan
- C16.04 ESB Pole sets
Chapter 17 Cultural Heritage
- C17.01 Legal & Planning Framework: Archaeological, Architectural and Cultural Heritage
- C17.02 Data Inventory: Cultural Heritage (300m assessment corridor)
- C17.03 Overview of the Archaeological and Historical Development of the Study Area
- C17.04a Archaeological LiDAR Assessment No. 1 Low Resolution LiDAR data
- C17.04b Archaeological LiDAR Assessment No. 2 Higher Resolution
- C17.05 Archaeological Geophysical Survey Final Report
- C17.06a Archaeological Investigations Programme Results TA1 Drumboe Lower
- C17.06b Archaeological Investigations Programme Results TA2 Trimragh
- C17.06c Archaeological Investigations Programme Results TA3 Carnshannagh
- C17.06d Archaeological Investigations Programme Results TA4 Murlough
- C17.06e Archaeological Investigations Programme Results TA5 Curraghalane
- C17.06f Archaeological Investigations Programme Results TA6 Drumgreggan
- C17.07 Site Investigations - Archaeological Monitoring Log and Results
- C17.08 S1 Summary Field Survey Results
- C17.09 S1 Detailed Walkover Survey and Photographic Record
- C17.10 S2 Summary Field Survey Results
- C17.11 S2 Detailed Walkover Survey and Photographic Record
- C17.12 S3 Summary Field Survey Results
- C17.13 S3 Detailed Walkover Survey and Photographic Record
- C17.14 No predicted Impact Cultural Heritage Datasets for the Proposed Development
Chapter 18 Landscape and Visual
Chapter 19 Interactions and Cumulative Effects
Volume D Book of Drawings
Chapter 4 Project Description
- 4.01 S1 General Arrangement
- 4.02 S2 General Arrangement
- 4.03 S3 General Arrangement
- 4.04 S1 Mainline Plan Profile
- 4.05 S2 Mainline Plan Profile
- 4.06 S3 Mainline Plan Profile
- 4.07 Side Road Plan Profile
- 4.08 Side Road Plan Profile
- 4.09 S3 Side Road Plan Profile
- 4.10 Link Road Plan Profile
- 4.11 Link Road Plan and Profile
- 4.12 S1 Structure Location Plan
- 4.13 River Finn Crossing
- 4.14 River Finn Access and Piling
- 4.15 River Finn Construction Temporary Works
- 4.16 Cloghroe River
- 4.17 Backlees River Bridge
- 4.18 S2 Structure Location Plan
- 4.19 River Swilly Crossing
- 4.20 River Swilly Access and Piling
- 4.21 River Swilly Construction Temporary Works
- 4.22 Existing Underpass N13 A016 GA
- 4.23 Existing Underpass N13 A016 GA
- 4.24 Active Travel Footbridge GA
- 4.25 S3 Structure Location Plan
- 4.26 River Deele
- 4.27 River Deele Sections
- 4.29 Swilly Burn
- 4.30 Typical Overbridge
- 4.31 Typical Skewed Overbridge
- 4.32 Typical High Skew Underbridge
- 4.33 Typical High Skew Underbridge Elevations
- 4.34 Buried Box
- 4.35 N14/N15 to A5 Link
- 4.36 N14/N15 Construction Methodology
- 4.37 N14/N15 Construction Sequence 1
- 4.38 N14/N15 Construction Sequence 2
- 4.39 RCA Abutment
- 4.40 S1 Drainage Layout
- 4.41 S2 Drainage Layout
- 4.42 S3 Drainage Layout
- 4.44 Principal Geometric Parameters
- 4.47 S1 Proposed Haulage Route
- 4.48 S2 Proposed Haulage Route
- 4.49 S3 Proposed Haulage Routes
- 4.50 S1 Park and Share Cycle Facility
- 4.51 S2 Park and Share Cycle Facility
- 4.52 S3 Park and Share Cycle Facility
- 4.54 S1 Proposed Road Lighting Network
- 4.55 S2 Proposed Road Lighting Network
- 4.56 S3 Proposed Road Lighting Network
- 4.57 S1 Fencing and Environmental Barrier
- 4.58 S2 Fencing and Environmental Barriers
- 4.59 S3 Fencing and Environmental Barriers
- 4.60 GI Earthworks S1 Mainline
- 4.61 GI Earthworks S2 Mainline
- 4.62 S3 GI Earthworks S3 Mainline
- 4.63 S1 Confirmatory GI
- 4.64 S2 Confirmatory GI
- 4.65 S3 Confirmatory GI
- 4.66 Typical Material Extraction and Deposition Areas
- 4.67 GI Earthworks S1 Side Roads
- 4.68 GI Earthworks S2 Side Roads
- 4.69 GI Earthworks S3 Side Roads
Chapter 7 Population
- 7.01 - Section 1 GeoDirectory Buildings within Proposed Development Boundary
- 7.02 - Section 2 GeoDirectory Buildings within Proposed Development Boundary
- 7.03 - Section 3 GeoDirectory Buildings within Proposed Development Boundary
Chapter 8 Human Health
- 8.01 - Human Health Study Area
- 8.02 - Pobal Deprivation Map by Electoral Division Pobal 2022
- 8.03 - Section 1 Health Assessment Indicative Community Location
- 8.04 - Section 2 Health Assessment Indicative Community Locations
- 8.05 - Section 3 Health Assessment Indicative Community Locations
- 8.06 - Section 1 Health Equity and Inequalities Assessment
- 8.07 - Section 2 Health Equity and Inequalities Assessment
- 8.08 - Section 3 Health Equity and Inequalities Assessment
Chapter 9A Biodiversity (Terrestrial)
- 9A.01 European Sites Irl Overview
- 9A.02 European Sites Irl All Sections Breakdown
- 9A.03 European Sites UK Overview
- 9A.04 European Sites UK All Sections Breakdown
- 9A.05 Lough Foyle Ramsar Site Overview
- 9A.06 Nationally Designated Sites Irl Overview
- 9A.07 Nationally Designated Sites Irl All Sections Breakdown
- 9A.08 Nationally Designated Sites UK Overview
- 9A.09 Nationally Designated Sites UK All Sections Breakdown
- 9A.10 Habitat Mapping Section 1
- 9A.11 Habitat Mapping Section 2
- 9A.12 Habitat Mapping Section 3
- 9A.13 Key Ecological Receptors Section 1
- 9A.14 Key Ecological Receptors Section 2
- 9A.15 Key Ecological Receptors - Section 3
- 9A.16 Globeflower Section 1
- 9A.17 Invasive Alien Plant Species Section 1
- 9A.18 Invasive Alien Plant Species Section 2
- 9A.19 Invasive Alien Plant Species Section 3
- 9A.20 Section 1 Otter Evidence pre-2022
- 9A.21 Section 1 Otter Evidence 2023-2025
- 9A.22 Section 2 Otter Evidence pre-2022
- 9A.23 Section 2 Otter Evidence 2023-2025
- 9A.24 Section 1 Trail Camera Locations
- 9A.25 Section 2 Trail Camera Locations
- 9A.26 Pre-2022 Bat Surveys Section 1 Transects
- 9A.27 Pre-2022 Bat Surveys Section 2 Transects
- 9A.28 Pre-2022 Bat Surveys Section 1 Structure Surveys
- 9A.29 Pre-2022 Bat Surveys Section 2 Structure Surveys
- 9A.30 Pre-2023 Bat Surveys S3 Buildings
- 9A.31 Pre-2023 Bat Surveys S3 Bridge Surveys
- 9A.32 Pre-2023 Bat Surveys S3 Tree Surveys
- 9A.33 Pre-2022 Bat Surveys Section 1 Static Detector Locations
- 9A.34 Pre-2022 Bat Surveys Section 2 Static Detector Locations
- 9A.35 Pre-2023 Bat Surveys Section 3 Static Detector Locations
- 9A.36 2025 Bat Surveys Section 1 Structures Preliminary Roost Assessment
- 9A.37 2025 Bat Surveys Section 1 Structures Emergence Surveys
- 9A.38 2025 Bat Surveys Section 2 Structures Preliminary Roost Assessment
- 9A.39 2025 Bat Surveys Section 2 Structures Emergence Surveys
- 9A.40 2025 Bat Surveys Section 1 Tree Roost Surveys
- 9A.41 2025 Bat Surveys Section 2 Tree Roost Surveys
- 9A.42 2023-2025 Bat Surveys S3 Buildings
- 9A.43 2023-2025 Bat Surveys S3 Bridge Surveys
- 9A.44 2025 Bat Surveys S3 Tree Surveys
- 9A.45 2025 Bat Surveys Section 1 Static Detector Locations
- 9A.46 2025 Bat Surveys Section 2 Static Detector Locations
- 9A.47 2023-2025 Bat Surveys S3 Static Detector Locations
- 9A.48 Breeding Birds Surveys 2020
- 9A.49 Breeding Birds Surveys 2023
- 9A.50 Kingfisher Surveys
- 9A.51 Breeding Raptor Survey Locations
- 9A.52 Section 1 Raptor VP Survey Results
- 9A.53 Section 1 2017-2018 Wintering Bird Survey Vantage Points
- 9A.54 Section 2 2017-2020 Wintering Bird Survey Study Area
- 9A.55 Section 2 2020-2021 Wintering Bird Survey Area
- 9A.56 Section 2 2022-2023 Wintering Bird Survey Study Area
- 9A.57 Section 2 2022-2023 Wintering Bird Windscreen Survey Results
- 9A.58 Section 2 2025-2026 Wintering Bird Survey Area
- 9A.59 Section 2 2025 Wintering Bird Survey Primary Flightline Locations
- 9A.60 Section 2 2025 Wintering Bird Survey Results
- 9A.61 S3 Pre-2025 Winter Bird Survey Locations
- 9A.62 2023 Bat Surveys - Section 3 Transects
- 9A.63 Pre-2023 Bat Survey - Section 3 Transects
- 9A.64 Section 2 2022-2023 Wintering Bird Survey Results Curlew
- 9A.65 Section 2 2022-2023 Wintering Bird Survey Results Greylag Goose
- 9A.66 Section 2 2022-2023 Wintering Bird Survey Results Redshank
- 9A.67 Section 2 2025-2026 Wintering Bird Survey Results Curlew
- 9A.68 Section 2 2025-2026 Wintering Bird Survey Results Teal
- 9A.69 Section 2 2025-2026 Wintering Bird Survey Results Greylag Goose
- 9A.70 Section 2 2025-2026 Wintering Bird Survey Results Redshank
- 9A.71 Section 3 2025-2026 Windscreen Survey Study Area
- 9A.72 Section 3 2025-2026 Survey Results
Chapter 9B Biodiversity (Aquatic)
- 9B.01 - Watercourse Survey Locations in Section 1
- 9B.02 - Watercourse Survey Locations in Section 2
- 9B.03 - Watercourse Survey Locations in Section 3
Chapter 10 Land, Soils and Hydrogeology
- 10.01 Bedrock Geology S1
- 10.02 Bedrock Geology S2
- 10.03 Bedrock Geology S3
- 10.04 Aggregate Potential S1
- 10.05 Aggregate Potential S2
- 10.06 Aggregate Potential S3
- 10.07 Geological Heritage Sites Communal
- 10.08 Quaternary Geology S1
- 10.09 Quaternary Geology S2
- 10.10 Quaternary Geology S3
- 10.11 Corine 2018 Land Cover S1
- 10.12 Corine 2018 Land Cover S2
- 10.13 Corine 2018 Land Cover S3
- 10.14 Quarries and Waste Facilities Communal
- 10.15 Landslide Vulnerability S1
- 10.16 Landslide Vulnerability S2
- 10.17 Landslide Vulnerability S3
- 10.18 Groundwater Aquifer S1
- 10.19 Groundwater Aquifer S2
- 10.20 Bedrock Aquifer S3
- 10.21 Groundwater Vulnerability S1
- 10.22 Groundwater Vulnerability S2
- 10.23 Groundwater Vulnerability S3
- 10.24 Groundwater Wells and Springs S1
- 10.25 Groundwater Wells and Springs S2
- 10.26 Groundwater Wells and Springs S3
- 10.27 S1 GI Plans
- 10.28 S2 GI Plans
- 10.29 S3 GI Plans
Chapter 11 Water
- 11.01 Catchment Layout Section 1
- 11.02 Catchment Layout Section 2
- 11.03 Catchment Layout Section 3
- 11.04 OPW Arterial Drainage Schemes Benefiting Lands Drainage Districts Section 2
- 11.05 OPW Arterial Drainage Schemes Benefiting Lands Drainage Districts Section 3
- 11.06 OPW Historical Flood Events Map Section 1
- 11.07 OPW Historical Flood Events Map Section 2
- 11.08 OPW Historical Flood Events Map Section 3
- 11.09 CFRAMNIFM Flood Extents Fluvial - Current Scenario S1
- 11.10 CFRAMNIFM Flood Extents Fluvial - Current Scenario S2
- 11.11 CFRAMNIFM Flood Extents Fluvial - Current Scenario S3
- 11.12 CFRAMNIFM Flood Extents Fluvial - MRFS S1
- 11.13 CFRAMNIFM Flood Extents Fluvial - MRFS S2
- 11.14 CFRAMNIFM Flood Extents Fluvial - MRFS S3
- 11.15 CFRAMNIFM Flood Extents Fluvial - HEFS S1
- 11.16 CFRAMNIFM Flood Extents Fluvial - HEFS S2
- 11.17 CFRAMNIFM Flood Extents Fluvial - HEFS S3
- 11.18 CFRAM Flood Extents Coastal - Current Scenario S2
- 11.19 CFRAM Flood Extents Coastal - Current Scenario S3
- 11.20 CFRAM Flood Extents Coastal - MRFS S2
- 11.21 CFRAM Flood Extents Coastal - MRFS S3
- 11.22 CFRAM Flood Extents Coastal - HEFS S2
- 11.23 CFRAM Flood Extents Coastal - HEFS S3
- 11.24 Flood Zone Maps - CFRAMNIFM S1
- 11.25 Flood Zone Maps - CFRAMNIFM S2
- 11.26 Flood Zone Maps - CFRAMNIFM S3
- 11.27 Wastewater Discharges Water Abstraction Locations S1
- 11.28 Wastewater Discharges Water Abstraction Locations S2
- 11.29 Wastewater Discharges Water Abstraction Locations S3
- 11.30 Water Quality Map Section 1
- 11.31 Water Quality Map Section 2
- 11.32 Water Quality Map Section 3
- 11.33 Water Framework Directiv 3 rd Cycle 2021-2027 Risk Map S1
- 11.34 Water Framework Directive 3 rd Cycle 2021-2027 Risk Map S2
- 11.35 Water Framework Directive 3 rd Cycle 2021-2027 Risk Map S3
- 11.36 Location of Bridge Crossings and Drainage Outfalls S1
- 11.37 Location of Bridge Crossings and Drainage Outfalls S2
- 11.38 Drainage Features Location Map S3
- 11.39 Section 1 EPA Delineated Watercourse Interactions
- 11.40 Section 2 EPA Delineated Watercourse Interactions
- 11.41 Section 3 EPA Delineated Watercourse Interactions
- 11.42 River Swilly Crossing - OSI Sixinch Cassini Historicalmapping Section 2
- 11.43 Donegal Catchment Map
- 11.44 Groundwater Flood Risk Map S3
Chapter 12 Air Quality
- 12.01 Section 1 Buffers - Existing Road
- 12.02 Section 2 Buffers - Existing Road
- 12.03 Section 3 Buffers - Existing Road
- 12.04 Section 1 Buffers - Proposed
- 12.05 Section 2 Buffers - Proposed
- 12.06 Section 3 Buffers - Proposed
Chapter 14 Noise and Vibration
- 14.01 Section 1 Baseline Noise Monitoring Locations
- 14.02 Section 2 Baseline Noise Monitoring Locations
- 14.03 Section 3 Baseline Noise Monitoring Locations
- 14.04 Section 1 Noise Barrier Locations
- 14.05 Section 2 Noise Barrier Locations
- 14.06 Section 3 Noise Barrier Locations
- 14.07 Section 1 Roads Traffic Linksincluded in Noise Model
- 14.08 Section 2 Roads Traffic Linksincluded in Noise Model
- 14.09 Section 3 Roads Traffic Linksincluded in Noise Model
Chapter 16 Material Assets Non-Agriculture
- 16.01 S1 Land Holdings
- 16.02 S2 Land Holdings
- 16.03 S3 Land Holdings
- 16.04 S1 Existing Utilities
- 16.05 S2 Existing Utilities
- 16.06 S3 Existing Utilities
- 16.07 S1 Proposed ESB Diversion
- 16.08 S2 Proposed ESB Diversion
- 16.09 S3 Proposed ESB Diversion
- 16.10 S1 Proposed Irish Water Diversion
- 16.11 S2 Proposed Irish Water Diversion
- 16.12 S3 Proposed Irish Water Diversion
- 16.13 S1 Proposed - Net Diversion
- 16.14 S2 Proposed - Net Diversion
- 16.15 S1 Proposed EIR Diversion
- 16.16 S2 Proposed EIR Diversion
- 16.17 S3 Proposed EIR Diversion
- 16.18 S2 Proposed Fibre Optic Project Kelv in Diversion
- 16.19 S3 Proposed Fibre Optic Project Kelv in Diversion
- 16.20 Waste Facilities Map
Chapter 17 Cultural Heritage
- 17.01 Section 1 Cultural Heritage
- 17.02 Section 2 Cultural Heritage
- 17.03 Section 3 Cultural Heritage
Chapter 18 Landscape and Visual
- 18.01 Landscape Character Areas - Designations - Section 1
- 18.02 Landscape Character Areas - Designations - Section 2
- 18.03 Landscape Character Areas - Designations - Section 3
- 18.04 Scenic Amenity Areas - Section 1
- 18.05 Scenic Amenity Areas - Section 2
- 18.06 Scenic Amenity Areas - Section 3
- 18.07 Rural Area Types - Section 1
- 18.08 Rural Area Types - Section 2
- 18.09 Rural Area Types - Section 3
- 18.10 Viewpoint Location Plan - Section 1
- 18.11 Viewpoint Location Plan - Section 2
- 18.12 Viewpoint Location Plan - Section 3
- 18.13 Residential Visual Impact Assessment 1
- 18.14 Residential Visual Impact Assessment Section 2
- 18.15 Residential Visual Impact Assessment Section 3
- 18.16 Landscape Mitigation - Section 1
- 18.17 Landscape Mitigation - Section 2
- 18.18 Landscape Mitigation - Section 3
- 18.19 Landscape and Habitat Design
- 18.20 Landscape and Habitat Design
- 18.21 Landscape and Habitat Design
Natura Impact Statement Appendices
- 01 Project Description
- 03 Consultations
- 04 Otter Evidence
- 05 Wintering Bird Evidence
- 06 Lifford Whooper Swan Monitoring Report
- 07 Aquatic Field Survey Results
- 08 Loughs Agency Fisheries Data (2020-2024)
- 09 Q-Value Data
- 10 Oligotrophic Waters [3110]
- 11 Construction Phase Impact Assessment – Culverts
- 12 Operational Phase Impact Assessment (Culverts)
- 13 Invasive Species Management Plan
Natura Impact Statement Drawings
- 00 NIS Drawings Index
- 01 NIS Section 1 General Arrangement Drawing
- 02 NIS Section 2 General Arrangement Drawing
- 03 NIS Section 3 General Arrangement Drawing
- 04 NIS Overview of Major River Catchments
- 05 NIS European Designated Sites
- 06 NIS Section 1 Breeding Birds Surveys 2020
- 07 NIS Section 1 Breeding Birds Surveys 2023
- 08 NIS Section 1 Wintering Bird Surveys 2017-2018
- 09 NIS Section 2 Wintering Bird Surveys 2017-2020
- 10 NIS Section 2 Wintering Bird Surveys 2020-2021
- 11 NIS Section 2 Wintering Bird Surveys 2022-2023
- 12 NIS Section 2 Wintering Bird Survey Area 2025-2026
- 13 NIS Section 1 Watercourse Survey Locations
- 14 NIS Section 2 Watercourse Survey Locations
- 15 NIS Section 3 Watercourse Survey Locations
- 16 NIS Section 1 Otter Evidence 2023-2025
- 17 NIS Section 1 Otter Evidence pre-2022
- 18 NIS Section 2 Otter Evidence 2023-2025
- 19 NIS Section 2 Otter Evidence pre-2022
- 20 NIS Section 3 2025-2026 Windscreen Survey Study Area
- 21 NIS Section 3 2025-2026 Windscreen Survey - Survey Results
- 22 NIS Finn Crossing Elevations
- 23 NIS Finn Crossing Access Piling
- 24 NIS Finn Crossing Construction Temporary Works
- 25 NIS Finn Crossing Constructive Method
- 26 NIS Finn Crossing Constructive Sequence Sheet 1
- 27 NIS Finn Crossing Constructive Sequence Sheet 2
- 28 NIS Swilly Crossing Access Piling
- 29 NIS Swilly Crossing Construction Temporary Works
- 30 NIS Section 1 Road Lighting
- 31 NIS Section 2 Road Lighting
- 32 NIS Section 3 Road Lighting
- 33 NIS Section 1 Drainage
- 34 NIS Section 2 Drainage
- 35 NIS Section 3 Drainage
- 36 NIS Section 2 2025-2026 Wintering Bird Survey Results Curlew
- 37 NIS Section 2 2025-2026 Wintering Bird Survey Results Teal
- 38 NIS Section 2 2025-2026 Wintering Bird Survey Results Greylag Goose
- 39 NIS Section 2 2025-2026 Wintering Bird Survey Results Redshank
- 40 NIS Section 2 2022-2023 Wintering Bird Survey Results Curlew
- 41 NIS Section 2 2022-2023 Wintering Bird Survey Results Greylag Goose
- 42 NIS Section 2 2022-2023 Wintering Bird Survey Results Redshank